The building work is now behind schedule but contractors are confident make up for lost time.
这项建筑工程目前落后于预定计划,但是承包人有信心把失去的时间补回来.
The housing shall be constructed of 304 Schedule 40 stainless steel pipe with groove end connections.
外壳应该由304目录40不锈钢管结构,配置槽状端口连接.
The task is set to ignore resource calendars for scheduling.
We have included on the other side a schedule and a list of things to bring.
Retailers have several price schedules.