Sandy Lin 15/F,TOWER2 ,BRIGHT CHINA,BUILDING1,BEIJING.
1985-Present LEYNER CORPORATION,Lake Charles,LA
Provide floor support engineering in printed wire assembly (PWA) and subsystem assembly (SSA) areas.
Purchase capital equipment.Interface with vendors. Justify expenditures.
Design plant layout fixtures,and flow charts of material.
Program automatic equipment.
Write process sheets and rework procedures.
Recommend changes to product to allow ease of manufacture.
Implement design changes.Inititate methods and process improvements.
Troubleshoot problems.Effect disposition or rejection of material.
Provide assistance to all other departments.
1984 PRUDENCE D. MCHARRISON LABORATORY,Ruston,LA